Home About Ryan Building Statistics Thesis Abstract Technical Assignments Thesis Research
Thesis Proposal Presentation Final Report Reflection Senior Thesis e-Studio
Ryan Blatz | Structural
Orange Regional Medical Center
Middletown, New York
______________________

 

Final

Report

 

 

FINAL THESIS REPORT

____________________________________________________

_____________________________________________________

EXECUTIVE SUMMARY

____________________________________________________

____________________________________________________

 

 

The Final Report addresses findings from earlier technical reports to explore whether or not a more efficient structural system exists. In search of this, the following report redesigns the existing steel structure as a concrete flat slab system, utilizing the concrete moment frames as the lateral resisting elements. It is found in this report that the flat slab system is sufficient for gravity loading, but shear walls must be added to efficiently resist lateral loads.

An architectural breadth addresses concerns with patient and employee flow by rearranging medical departments on the first and third floors. This study also addresses patient comfort by relocating the healing garden to a location that's more convenient and more aesthetically pleasing for patients.

A second breadth study is completed on the construction management side of the project. The study includes a cost and schedule analysis for comparative purposes with the existing costs and construction schedule. This study is ultimately the deciding factor, showing that the redesigned system is neither cost or schedule effective.

To view the entire report in pdf format, Click Here or the image to the left.

To view the Executive Summary of the report, Click Here or the image to the left.

 

Senior Thesis Main Page Penn State Homepage AE Homepage AE Computer Labs Contact Ryan Blatz

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐inprogress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Ryan Blatz. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design."

This page was last updated on 4/24/12, by Ryan Blatz and is hosted by the AE Department ©2011